Portfolio
ZICLA Road Striping
Various Sites
Client:
Department of Transportation
Status:
On-Going
Services Performed:
Masonry
Industry:
Federal
Overview:
- Installing multi-modal safety projects of scales varying from individual intersections up to two mile-long roadway corridors. These projects will specifically entail the creation of new and/or updated bicycle facilities, pedestrian facilities, and bus-priority elements.
- Installing and maintaining ZICLA Vectorial platforms and their related equipment, such as ramps, flex posts, curb flaps, and any other functional part of this modular system
- Changing existing roadway patterns through sequentially-phased adjustments to traffic movements and patterns, and in coordination with DDOT CA and other DDOT resources (traffic control officers, roadway operations patrol, etc.)
- Installing pavement markings, signage, and roadway equipment
- Demolishing, removing, and disposing of concrete, asphalt, reinforcing steel, and related roadway elements
- Building new roadway, sidewalk, and bicycle facility elements from concrete, reinforcing steel, asphalt, stone products, soil products, and other related materials
Ready to Start Building for Tomorrow, Today?
Tagged public works highlight